The Result: Increased competitiveness
Our consulting efforts concentrate on maximum cost reduction in order to improve the operating result and competitiveness within a very short time. This means: - Waste elimination and reduction in all processes and improvement of the share of value-added activity.
- Introduction of Takt-Time-Flow-Production and process synchronisation in order to reduce lead time.
- Process Improvements through breaking down, integrating and creating parallel processes.
- Reduction of production costs through load-levelled production planning.
- Education of management and employees in Kaizen practice and the developement of a corporate culture which supports the Kaizen philosophy of continuous improvement in the long term.
|

The examples show the results of KPC consulting work at renowned industrial manufacturers in Europe and Asia within 1, 2 and 4 years. Your Potential
|